Physical Work On ADP Scheme Namely 170355 - Reconstruction Of Old Block Of P&D Department Was In Progress.
Physical work on ADP Scheme namely 170355 - Reconstruction of old Block of P&D Department was in progress. In this regard, the M&E Team comprising of Additional Director General, Deputy Directors Peshawar visited the said scheme on 24th February 2022 along with the Designer, SDO, and contractor. Steel fabrication work of semi-basement was finalized by the C&W Department which was thoroughly checked by the M&E team and found that most of the reinforcement for structural members was found against the structure design. Proper instruction was given by the M&E to the C&W Department and Contractor for re-fixing of the steel as per approved structural design before pouring of concrete.